Skip to content
Belisari
1,503 MW contracted & closed

Powered land.
Buy, sell, develop.

Belisari is the M&A marketplace for powered land and data center sites — deep power-market expertise on every deal, attention to every detail through closing, and we can help develop sites alongside you when that's the right path.

Belisari by the numbers

Platform

Contracted & closed
1,503MW
Power on platform
1.86GW
Sites on platform
19
Average power rate
$0.0442/kWh

Development record

Powered land co-developed
600MW

The platform

Incredible tools to support the development process.

Search any county, open an asset, and read the things that decide a site — transmission, fiber, flood — on one map instead of five.

Search any county
Jump to a county, a substation or a plant by name.
Stack the layers
Transmission, fiber and FEMA flood over the same ground.
Open an asset
Capacity, fuel, owner and coordinates, straight from the map.
Open the map

Powered land & M&A

Recently contracted.

A sample of recent Belisari transactions. Locations, site data, and live inventory are shared directly with approved partners.

  1. Step 1

    Request access

    Tell us who you are and what you're looking for.

  2. Step 2

    Belisari reviews it

    Every request is reviewed personally by our team.

  3. Step 3

    Get site details

    Exact locations, site data, and data rooms — shared directly.

Self-serve

Know the fiber
before you commit.

Power is only half the question. Pick a parcel and we'll tell you which carriers have route in reach, how far each tier of the network actually is from the boundary, and what a lateral would cost to build — the same analysis we run on our own deals.

  • Every carrier with a route in reach, not just the nearest
  • Longhaul, regional and metro tiers measured separately
  • Lateral build cost to each tier, from survey construction rates
  • Branded PDF you can put straight into a diligence pack
Run a fiber report

$50 per parcel

Sample output · Brazoria County, TX

TierCarrierDistance
Longhaul BackboneWindstream27.5 mi
Regional BackboneFiberLight6.7 mi
Metro BackboneCable One0.1 mi
MetroZayo16.0 mi

Twelve carriers were in range on this parcel. The nearest route was a metro tap 0.1 miles out — useful, but a different product from the backbone 27.5 miles away.

Client reviews

Trusted on both sides of the deal.

Our team works day and night to achieve a successful outcome for our clients.

  • “The team at Belisari helped us locate and navigate a large scale, transmission level project to support our growth goals.”

    Jamie M.
    Co-Founder & CEO
  • “The most hands-on, thorough site selection / M&A group in the space.”

    James M.
    Chief Growth Officer
  • “Partnering with Belisari was transformative for our data center project. Within days of listing, they connected us with a highly qualified pool of buyers, and we entered due diligence just one week later, leading to a successful close within three weeks.”

    Jake B.
    Chief Technology Officer
  • “Working with Belisari has been a game-changer in identifying the right partners for my data center sites. Their deep expertise in power markets, utility contracts and the broader industry is second to none. I wouldn’t make a move without their insight.”

    Colton S.
    Founder & CEO
  • “Belisari’s team work with us on a turnkey site sale transaction. Throughout the process, Belisari has demonstrated its wide reach of its professional network and strong expertise and knowledge in the industry. The team was very engaged on both sides on every step of the execution with a solutions-oriented mindset and managed to bring a complex transaction to successful closing in a smooth manner and short time framework.”

    Xiaoxi Y.
    Co-Founder & CEO
  • “Belisari’s has an amazing team that knows the power markets and dives into each data center site opportunity, learning it inside and out as if it were their own.”

    Robert D.
    CEO
  • “Belisari’s team really got what we were looking for and quickly connected us with a great hosting customer for our data center. They stayed on top of every detail, kept the communication flowing, and followed up without missing a beat. They’ve got a real drive to get deals done, and we’re looking forward to working with them again.”

    Raine C.
    CEO
  • “Working with Belisari was seamless. We are always exploring new powered land opportunities. Their platform presents available projects in a clean, consistent format and helped us pinpoint and close on a great site that fit our criteria.”

    Micah B.
    VP of Projects

Work with Belisari

Bring us a site, a load, or a thesis.

Landowners, operators, utilities, and investors — tell us what you're working on and we'll tell you what the power is really worth and what it takes to transact.