Skip to content
Belisari
1,503 MW contracted & closed

Powered land.
Buy, sell, develop.

Belisari is the M&A marketplace for powered land and data center sites — deep power-market expertise on every deal, attention to every detail through closing, and we can help develop sites alongside you when that's the right path.

Belisari by the numbers

Platform

Power on platform
3,450MW
Sites on platform
32

Record

Contracted & closed
1,503MW
Powered land principally developed
600MW

Footprint

16states

where owners have brought sites to the platform

6 listed publicly. 26 more are shared privately, with approved buyers only.

FewerMore sitesState level onlySee the publicly listed sites →

Two halves of a site

Power is still the hardest part. Community is the least solved.

Power

When Belisari started, power was the hardest thing about every site, and it still is: capacity a utility will deliver, on a date it will stand behind, at a price that holds.

3,450MW

Power on the platform

How we underwrite power

Community

A site also needs the people around it. Community alignment has never been clean, clear or repeatable: every county starts from a blank page, often in the middle of a pause. We want to help with that, by putting what a project could pay its neighbors and what an ordinance could require in writing.

1,542

Local actions on data centers, in 807 counties

Community Benefits

Advisory and capital

Five places a site can change hands.

Pick one. Everything up to the flag is the seller's to deliver, everything past it the buyer's to build. We advise on where to hand off, and can bring the capital for the leg that gets a site there.

Development framework

Power & grid approvalCompletedEntitlements & permittingCompletedLand & site controlCompletedInfrastructureCompletedEnergizationNot startedDesignAfter handoffShellAfter handoffFit-outAfter handoffComputeAfter handoffOperationalAfter handoffPOWER TO THE SITEDATA CENTER BUILD

Gold is completed, amber in progress. What lies past the flag is dashed: the buyer's to build after the handoff.

Hand off at

Energy Build

The land with the infrastructure that takes the power: built, and often energized.

Capital the seller has in

What a megawatt fetches

Work left for the buyer

How soon the buyer earns

Relative across the five stages. Not figures.

Advisory

Who buys here, and on what paper

Miners and HPC operators
They need energized power and little else, and can be running in containers within months.
Owner-users
They bring their own building and machines, and want the meter to be the seller's last responsibility.
Data center developers
They start the shell on day one without waiting for the utility.
  • Lease
  • Power rights + land lease
  • JV
  • Asset or entity sale
Walk through every stage

Capital

What it takes to get a site here

Power infrastructure

  • The utility's facilities and the owner's contribution to them
  • Substation, transformers and breakers, ordered early
  • Commissioning and energization
  • Infrastructure capital
  • A joint venture with a power developer
  • Co-investment
See where capital goes in

The platform

Incredible tools to support the development process.

Search any county, open an asset, and read the things that decide a site — transmission, fiber, flood — on one map instead of five.

Search any county

Jump to a county, a substation or a plant by name.

Stack the layers

Transmission, fiber and FEMA flood over the same ground.

Open an asset

Capacity, fuel, owner and coordinates, straight from the map.

Open the map

Powered land & M&A

Recently contracted.

A sample of transactions Belisari has closed. What is on the market now is under current sites.

  • Greenfield

    Contracted capacity

    14 MW

    Energy rate
    $0.0420/kWh
    Energization
    2 months
  • Greenfield

    Contracted capacity

    74–170 MW

    Energy rate
    $0.0350/kWh
    Energization
    12 months
  • Greenfield

    Contracted capacity

    60 MW

    Energy rate
    $0.0390/kWh
    Energization
    4 months

To see what is on the market now

  1. Step 1

    Request access

    Tell us who you are and what you're looking for.

  2. Step 2

    Belisari reviews it

    Every request is reviewed personally by our team.

  3. Step 3

    Get site details

    Exact locations, site data, and data rooms — shared directly.

Client reviews

Trusted on both sides of the deal.

Our team works day and night to achieve a successful outcome for our clients.

  • “The team at Belisari helped us locate and navigate a large scale, transmission level project to support our growth goals.”

    Jamie M.
    Co-Founder & CEO
  • “The most hands-on, thorough site selection / M&A group in the space.”

    James M.
    Chief Growth Officer
  • “Partnering with Belisari was transformative for our data center project. Within days of listing, they connected us with a highly qualified pool of buyers, and we entered due diligence just one week later, leading to a successful close within three weeks.”

    Jake B.
    Chief Technology Officer
  • “Working with Belisari has been a game-changer in identifying the right partners for my data center sites. Their deep expertise in power markets, utility contracts and the broader industry is second to none. I wouldn’t make a move without their insight.”

    Colton S.
    Founder & CEO
  • “Belisari’s team work with us on a turnkey site sale transaction. Throughout the process, Belisari has demonstrated its wide reach of its professional network and strong expertise and knowledge in the industry. The team was very engaged on both sides on every step of the execution with a solutions-oriented mindset and managed to bring a complex transaction to successful closing in a smooth manner and short time framework.”

    Xiaoxi Y.
    Co-Founder & CEO
  • “Belisari’s has an amazing team that knows the power markets and dives into each data center site opportunity, learning it inside and out as if it were their own.”

    Robert D.
    CEO
  • “Belisari’s team really got what we were looking for and quickly connected us with a great hosting customer for our data center. They stayed on top of every detail, kept the communication flowing, and followed up without missing a beat. They’ve got a real drive to get deals done, and we’re looking forward to working with them again.”

    Raine C.
    CEO
  • “Working with Belisari was seamless. We are always exploring new powered land opportunities. Their platform presents available projects in a clean, consistent format and helped us pinpoint and close on a great site that fit our criteria.”

    Micah B.
    VP of Projects

Work with Belisari

Bring us a site, a load, or a thesis.

Landowners, operators, utilities, and investors — tell us what you're working on and we'll tell you what the power is really worth and what it takes to transact.