Skip to content
Belisari
← Insights

What a buyer can know about a powered site before an NDA

Sites are shared by codename and state first. What a teaser shows, what it holds back, and what opens once an NDA is signed.

Belisari · November 16, 2026 · 3 min read

Powered sites are sold quietly. An owner who names a location too early invites competitors to the same utility and the same neighbors. So a site is shared in two steps: enough to judge whether it fits, then everything, under a non-disclosure agreement.

Before an NDA

Belisari shares a site by codename and state. A teaser gives the shape of the site without placing it:

  • The state and the power market it sits in.
  • Capacity as a rounded range, and each block of capacity by where it stands: energized, approved or in study.
  • Timing by quarter.
  • The stage of the site and how it is offered: a sale, a lease, a joint venture.
  • The land in outline: acreage and how it is controlled, with no address and no parcel numbers.

What is held back

The location, the owner, the utility's documents, exact megawatts and exact dates. These are what a competitor could use, and what a buyer needs only once it is serious.

After an NDA

Once a mutual NDA is signed, the site opens in full: where it is, the exact capacity and its approvals, the land documents, and the data room with the utility studies and agreements behind every claim.

How to judge a site from a teaser

  • Look at how much capacity is approved against how much is still in study. The range alone does not say.
  • Match the timing to your own. A site energizing in two years does not help a need next year.
  • Check the stage against what you want to build yourself.
  • Ask what document stands behind each megawatt. A good answer is specific.

The sites Belisari lists publicly are at belisari.com/sites/available. More are shared privately with approved buyers.

Work with Belisari

Bring us a site, a load, or a thesis.

Landowners, operators, utilities, and investors — tell us what you're working on and we'll tell you what the power is really worth and what it takes to transact.