Skip to content
Belisari
← Power data by state

Alabama power data

As of December 31, 2025, Alabama had 48 active interconnection requests totaling 8.5 GW of proposed generation and storage, in 24 counties. Of that, 3.1 GW (37%) has a signed interconnection agreement, and 4.2 GW proposes to be online by the end of 2028. Alabama ranks number 39 among the states by capacity in the queue.

8.5 GW

In the queue

48

Active requests

3.1 GW

Agreement signed

4.2 GW

Proposed by 2028

What is waiting to connect in Alabama

The interconnection queue is the list of power plants and batteries that have asked to connect to the grid. A project that pairs solar with a battery is split between the two.

FuelCapacityShare
Solar4.2 GW49%
Gas2.9 GW34%
Battery storage849 MW10%
Other601 MW7%

Alabama counties with the most capacity in the queue

CountyCapacityRequests
Mobile County1.2 GW4
Colbert County958 MW2
Perry County656 MW4
Morgan County528 MW1
Autauga County478 MW4
Limestone County471 MW4
Baldwin County459 MW3
Jackson County399 MW2
Escambia County399 MW2
Greene County394 MW2

Who holds the queue

The grid operator or utility each request was filed with.

OperatorCapacityRequests
SOCO5.4 GW35
TVA3.1 GW13

The same data set records 410 requests in Alabama that were withdrawn, 104.4 GW in all. Most projects that enter a queue are never built.

Opportunity zones in Alabama

Alabama has 141 opportunity zones on the map certified on November 5, 2026, which takes effect January 1, 2027. 69 are newly designated and 72 carry over from the 2018 map; 65 are rural. 95 tracts on the 2018 map are not on the new one.

Newly designated and carried over are Belisari's comparison of the two maps, tract by tract.

Reading this for a data center site

  • The queue is the supply side: generation and storage asking to connect. It does not show data center or other load requests, which utilities and grid operators do not publish by location.
  • A county with a large queue has developers competing for the same substations and lines. That can mean new supply nearby, and it can also mean a crowded study process.
  • Capacity with a signed agreement is the likelier to be built. Capacity still in study is a claim on the grid, not a plant.

Sources and method

Interconnection queue: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition (CC BY 4.0), requests through December 31, 2025. Projects are placed by the county they name; about 1% name none and are left out. “Agreement signed” means the request has an executed interconnection agreement or is in construction. Opportunity zones: U.S. Treasury, CDFI Fund: Opportunity Zones. Counts and breakdowns are Belisari's, from the files behind its power map. Not investment or tax advice.

Other states:TexasCaliforniaArizonaOregonIllinoisMichiganIndianaNevadaAll states