Skip to content
Belisari
← Power data by state

Illinois power data

As of December 31, 2025, Illinois had 416 active interconnection requests totaling 73.7 GW of proposed generation and storage, in 81 counties. Of that, 11.0 GW (15%) has a signed interconnection agreement, and 64.8 GW proposes to be online by the end of 2028. Illinois ranks number 5 among the states by capacity in the queue.

73.7 GW

In the queue

416

Active requests

11.0 GW

Agreement signed

64.8 GW

Proposed by 2028

What is waiting to connect in Illinois

The interconnection queue is the list of power plants and batteries that have asked to connect to the grid. A project that pairs solar with a battery is split between the two.

FuelCapacityShare
Solar37.2 GW50%
Wind16.9 GW23%
Battery storage16.6 GW22%
Gas1.8 GW2%
Other1.3 GW2%

Illinois counties with the most capacity in the queue

CountyCapacityRequests
McLean County3.3 GW18
Christian County2.6 GW12
Lee County2.5 GW16
Peoria County2.5 GW8
Sangamon County2.4 GW10
Tazewell County2.1 GW12
Kankakee County1.9 GW11
Perry County1.9 GW9
Iroquois County1.8 GW8
Fulton County1.7 GW6

Who holds the queue

The grid operator or utility each request was filed with.

OperatorCapacityRequests
MISO52.6 GW273
PJM21.1 GW143

The same data set records 667 requests in Illinois that were withdrawn, 114.7 GW in all. Most projects that enter a queue are never built.

Opportunity zones in Illinois

Illinois has 240 opportunity zones on the map certified on November 5, 2026, which takes effect January 1, 2027. 164 are newly designated and 76 carry over from the 2018 map; 78 are rural. 252 tracts on the 2018 map are not on the new one.

Newly designated and carried over are Belisari's comparison of the two maps, tract by tract.

Reading this for a data center site

  • The queue is the supply side: generation and storage asking to connect. It does not show data center or other load requests, which utilities and grid operators do not publish by location.
  • A county with a large queue has developers competing for the same substations and lines. That can mean new supply nearby, and it can also mean a crowded study process.
  • Capacity with a signed agreement is the likelier to be built. Capacity still in study is a claim on the grid, not a plant.

1 site in Illinois has been brought to Belisari's marketplace for powered land and data center sites.

Sources and method

Interconnection queue: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition (CC BY 4.0), requests through December 31, 2025. Projects are placed by the county they name; about 1% name none and are left out. “Agreement signed” means the request has an executed interconnection agreement or is in construction. Opportunity zones: U.S. Treasury, CDFI Fund: Opportunity Zones. Counts and breakdowns are Belisari's, from the files behind its power map. Not investment or tax advice.

Other states:TexasCaliforniaArizonaOregonMichiganIndianaNevadaWashingtonAll states