Skip to content
Belisari
← Power data by state

Alaska power data

As of December 31, 2025, the national interconnection queue data set lists no active requests in Alaska.

Opportunity zones in Alaska

Alaska has 25 opportunity zones on the map certified on November 5, 2026, which takes effect January 1, 2027. 14 are newly designated and 11 carry over from the 2018 map; 17 are rural. 14 tracts on the 2018 map are not on the new one.

Newly designated and carried over are Belisari's comparison of the two maps, tract by tract.

Reading this for a data center site

  • The queue is the supply side: generation and storage asking to connect. It does not show data center or other load requests, which utilities and grid operators do not publish by location.
  • A county with a large queue has developers competing for the same substations and lines. That can mean new supply nearby, and it can also mean a crowded study process.
  • Capacity with a signed agreement is the likelier to be built. Capacity still in study is a claim on the grid, not a plant.

Sources and method

Interconnection queue: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition (CC BY 4.0), requests through December 31, 2025. Projects are placed by the county they name; about 1% name none and are left out. “Agreement signed” means the request has an executed interconnection agreement or is in construction. Opportunity zones: U.S. Treasury, CDFI Fund: Opportunity Zones. Counts and breakdowns are Belisari's, from the files behind its power map. Not investment or tax advice.

Other states:TexasCaliforniaArizonaOregonIllinoisMichiganIndianaNevadaAll states