Skip to content
Belisari
← Power data by state

Kansas power data

As of December 31, 2025, Kansas had 138 active interconnection requests totaling 32.4 GW of proposed generation and storage, in 53 counties. Of that, 9.2 GW (28%) has a signed interconnection agreement, and 16.1 GW proposes to be online by the end of 2028. Kansas ranks number 15 among the states by capacity in the queue.

32.4 GW

In the queue

138

Active requests

9.2 GW

Agreement signed

16.1 GW

Proposed by 2028

What is waiting to connect in Kansas

The interconnection queue is the list of power plants and batteries that have asked to connect to the grid. A project that pairs solar with a battery is split between the two.

FuelCapacityShare
Solar14.9 GW46%
Wind7.5 GW23%
Battery storage5.7 GW18%
Gas4.0 GW12%
Other177 MW1%

Kansas counties with the most capacity in the queue

CountyCapacityRequests
Finney County2.9 GW7
Sumner County1.9 GW7
Hodgeman County1.8 GW5
Ford County1.6 GW9
Linn County1.4 GW3
Labette County1.4 GW3
Sedgwick County1.4 GW8
Scott County1.3 GW4
Cloud County1.2 GW6
Bourbon County1.0 GW5

Who holds the queue

The grid operator or utility each request was filed with.

OperatorCapacityRequests
SPP32.4 GW138

The same data set records 387 requests in Kansas that were withdrawn, 80.4 GW in all. Most projects that enter a queue are never built.

Opportunity zones in Kansas

Kansas has 53 opportunity zones on the map certified on November 5, 2026, which takes effect January 1, 2027. 34 are newly designated and 19 carry over from the 2018 map; 27 are rural. 55 tracts on the 2018 map are not on the new one.

Newly designated and carried over are Belisari's comparison of the two maps, tract by tract.

Reading this for a data center site

  • The queue is the supply side: generation and storage asking to connect. It does not show data center or other load requests, which utilities and grid operators do not publish by location.
  • A county with a large queue has developers competing for the same substations and lines. That can mean new supply nearby, and it can also mean a crowded study process.
  • Capacity with a signed agreement is the likelier to be built. Capacity still in study is a claim on the grid, not a plant.

1 site in Kansas has been brought to Belisari's marketplace for powered land and data center sites.

Sources and method

Interconnection queue: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition (CC BY 4.0), requests through December 31, 2025. Projects are placed by the county they name; about 1% name none and are left out. “Agreement signed” means the request has an executed interconnection agreement or is in construction. Opportunity zones: U.S. Treasury, CDFI Fund: Opportunity Zones. Counts and breakdowns are Belisari's, from the files behind its power map. Not investment or tax advice.

Other states:TexasCaliforniaArizonaOregonIllinoisMichiganIndianaNevadaAll states