Maryland power data

As of December 31, 2025, Maryland had 48 active interconnection requests totaling 5.6 GW of proposed generation and storage, in 19 counties. Of that, 1.5 GW (26%) has a signed interconnection agreement, and 4.5 GW proposes to be online by the end of 2028. Maryland ranks number 41 among the states by capacity in the queue.

5.6 GW

In the queue

48

Active requests

1.5 GW

Agreement signed

4.5 GW

Proposed by 2028

What is waiting to connect in Maryland

The interconnection queue is the list of power plants and batteries that have asked to connect to the grid. A project that pairs solar with a battery is split between the two.

FuelCapacityShare
Battery storage3.1 GW56%
Solar2.3 GW40%
Gas98 MW2%
Wind80 MW1%

Maryland counties with the most capacity in the queue

CountyCapacityRequests
Charles County1.5 GW4
Prince George's County886 MW5
Garrett County675 MW3
Montgomery County500 MW1
Harford County500 MW1
Baltimore County395 MW4
Caroline County202 MW1
Calvert County180 MW1
Worcester County167 MW3
Wicomico County136 MW7

Who holds the queue

The grid operator or utility each request was filed with.

OperatorCapacityRequests
PJM5.6 GW48

The same data set records 384 requests in Maryland that were withdrawn, 46.0 GW in all. Most projects that enter a queue are never built.

Opportunity zones in Maryland

Maryland has 114 opportunity zones on the map certified on November 5, 2026, which takes effect January 1, 2027. 56 are newly designated and 58 carry over from the 2018 map; 29 are rural. 90 tracts on the 2018 map are not on the new one.

Newly designated and carried over are Belisari's comparison of the two maps, tract by tract.

Reading this for a data center site

  • The queue is the supply side: generation and storage asking to connect. It does not show data center or other load requests, which utilities and grid operators do not publish by location.
  • A county with a large queue has developers competing for the same substations and lines. That can mean new supply nearby, and it can also mean a crowded study process.
  • Capacity with a signed agreement is the likelier to be built. Capacity still in study is a claim on the grid, not a plant.

Sources and method

Interconnection queue: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition (CC BY 4.0), requests through December 31, 2025. Projects are placed by the county they name; about 1% name none and are left out. “Agreement signed” means the request has an executed interconnection agreement or is in construction. Opportunity zones: U.S. Treasury, CDFI Fund: Opportunity Zones. Counts and breakdowns are Belisari's, from the files behind its power map. Not investment or tax advice.