Skip to content
Belisari
← Power data by state

Minnesota power data

As of December 31, 2025, Minnesota had 153 active interconnection requests totaling 28.5 GW of proposed generation and storage, in 53 counties. Of that, 1.3 GW (5%) has a signed interconnection agreement, and 20.3 GW proposes to be online by the end of 2028. Minnesota ranks number 19 among the states by capacity in the queue.

28.5 GW

In the queue

153

Active requests

1.3 GW

Agreement signed

20.3 GW

Proposed by 2028

What is waiting to connect in Minnesota

The interconnection queue is the list of power plants and batteries that have asked to connect to the grid. A project that pairs solar with a battery is split between the two.

FuelCapacityShare
Solar13.2 GW46%
Battery storage7.7 GW27%
Wind5.5 GW19%
Gas1.7 GW6%
Other382 MW1%

Minnesota counties with the most capacity in the queue

CountyCapacityRequests
Benton County2.0 GW11
Olmsted County1.6 GW11
Goodhue County1.6 GW6
Sherburne County1.6 GW5
Redwood County1.5 GW6
Mower County1.3 GW7
Watonwan County1.0 GW1
Cottonwood County950 MW3
Lyon County940 MW5
Clay County922 MW4

Who holds the queue

The grid operator or utility each request was filed with.

OperatorCapacityRequests
MISO28.5 GW153

The same data set records 482 requests in Minnesota that were withdrawn, 80.5 GW in all. Most projects that enter a queue are never built.

Opportunity zones in Minnesota

Minnesota has 73 opportunity zones on the map certified on November 5, 2026, which takes effect January 1, 2027. 30 are newly designated and 43 carry over from the 2018 map; 29 are rural. 89 tracts on the 2018 map are not on the new one.

Newly designated and carried over are Belisari's comparison of the two maps, tract by tract.

Reading this for a data center site

  • The queue is the supply side: generation and storage asking to connect. It does not show data center or other load requests, which utilities and grid operators do not publish by location.
  • A county with a large queue has developers competing for the same substations and lines. That can mean new supply nearby, and it can also mean a crowded study process.
  • Capacity with a signed agreement is the likelier to be built. Capacity still in study is a claim on the grid, not a plant.

Sources and method

Interconnection queue: Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition (CC BY 4.0), requests through December 31, 2025. Projects are placed by the county they name; about 1% name none and are left out. “Agreement signed” means the request has an executed interconnection agreement or is in construction. Opportunity zones: U.S. Treasury, CDFI Fund: Opportunity Zones. Counts and breakdowns are Belisari's, from the files behind its power map. Not investment or tax advice.

Other states:TexasCaliforniaArizonaOregonIllinoisMichiganIndianaNevadaAll states